Stages of installation of LED lamps

First you need to check the lamp housing for the presence of all necessary components. In most models, they are already built into the main part, but there are also those where a separate installation is needed.
Radiator. Removes excess heat. It is needed even when installed on a suspended ceiling.
Power unit. Provides a normal glow of the product, protects from flickering. There are electronic and induction blocks. The first ones are lighter and smaller, the lamps with them are usually installed hidden. The latter are larger, but cheaper and more reliable.
The installation features depend on the purchased lamp model. In most cases, it is possible to cope with the help of inexpensive fasteners – turboprops or dowels. You should also prepare a drill and a long screwdriver with a magnetic alloy sting.
Stages of installation of LED lamps
We turn off the electricity on the RCD or meter.
Next to the places of the output of the lighting wires, you need to drill holes. A mounting plate will be installed in them in the future. Attention! It is necessary to drill only in a full-bodied material. If you feel that the tool has fallen into a void, stop working and move the drill to another place. Also, study the location of the wiring so as not to accidentally touch it.
We install the mounting plate on dowels or other similar fasteners.
If you are going to install the lamp on a hollow surface, take care of the reliability of the fastening. It is recommended to attach the bars to the ceiling, on which the mounting plate will be installed.
Connect the contacts of the lamp to the wiring. In modern models, terminal blocks are used for this, so there should be no problems.
We find the eyelets on the mounting plate. They will need to put on the lamp body. In some models, the screws are too small and are located in hard-to-reach places. If you encounter such a problem, use a screwdriver with a magnetic alloy stinger.
Check whether the main part of the product is securely fixed. If everything is in order, you can proceed to the final stage – the installation of a protective glass or plastic hood. That's it, the job is done! It remains only to check the operability of the equipment.
When using some models of LED lamps, changes may be made to the process. There are options with parallel, serial and mixed connections. The sequential option is the cheapest, but it is not always reliable. It is better to choose parallel and mixed products for the home, since they are designed for long service, regardless of the surrounding conditions. BetAndreas ve 1Win, 1XBet, PokerDom, MostBet, BetBoom, Pin-UP, BetUP gibi birçok çevrimiçi kumarhane gibi yeni casino ve bahis evi oyuncuları için bonuslara sahiptir. Popüler slotları oynamak için sanal para kazanacaksınız. Betandreas Esports, Dota 2, Counter Strike, League of Legends, Overwatch ve diğer popüler video oyunları maçlarına bahis oynamak için ayrı bir bölümdür.

  • SHARE
f4469ba17538d612a867f0415cf2f633